Welcome to Auto, Motorcycle Parts & Accessories official website!

Steel Wheel Hub Specification Example for Construction Equipment: Touring Version

Source:Engine Assembly / Time:2026-09-18

Steel Wheel Hub Specification Example for Construction Equipment: Touring Version

This is a worked specification for steel wheel hub in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The touring version version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Steel Wheel Hub

Example specification

ItemSteel Wheel Hub
ApplicationConstruction Equipment
VersionTouring Version
Base materialAnodised Aluminium
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishanodised
MOQ1,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceCCC

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Anodised Aluminium, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Steel Wheel Hub example

Processes involved

  • ultrasonic cleaning
  • precision stamping
  • robot welding
  • powder coating
  • laser cutting
  • electroplating

Where this example applies

Programmes that run touring version most often specify this build for construction equipment. Related applications include export programmes, workshop replacements, fleet maintenance, camper conversions, utility trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top