Ball Auto Bearing Specification Example for Light Trucks: Touring Version
Ball Auto Bearing Specification Example for Light Trucks: Touring Version
This is a worked specification for ball auto bearing in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The touring version version exists because the duty cycle on light trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Example specification
| Item | Ball Auto Bearing |
|---|---|
| Application | Light Trucks |
| Version | Touring Version |
| Base material | Nylon 66 |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | zinc plated |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ISO 9001 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Nylon 66, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- shot blasting
- anodising
- die casting
- heat treatment
- electroplating
- injection moulding
Where this example applies
Programmes that run touring version most often specify this build for light trucks. Related applications include export programmes, municipal fleets, three-wheelers, courier fleets, aftermarket retail.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Send the specification you are working to and we will confirm what we can match, what we would change and why.



