Daytime Running Light Specification Example for City Buses: OEM Replacement
Daytime Running Light Specification Example for City Buses: OEM Replacement
This is a worked specification for daytime running light in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The oem replacement version exists because the duty cycle on city buses is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Example specification
| Item | Daytime Running Light |
|---|---|
| Application | City Buses |
| Version | OEM Replacement |
| Base material | Silicone |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | painted |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | E-mark |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Silicone, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- CNC machining
- gravity casting
- heat treatment
- laser cutting
- surface grinding
- ultrasonic cleaning
Where this example applies
Programmes that run oem replacement most often specify this build for city buses. Related applications include camper conversions, passenger cars, city buses, workshop replacements, light trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



