Welcome to Auto, Motorcycle Parts & Accessories official website!

Car Alternator Repair Specification Example for Trailer Axles: Two-Piece Construction

Source:12V Electric Car Fridge / Time:2026-09-18

Car Alternator Repair Specification Example for Trailer Axles: Two-Piece Construction

This is a worked specification for car alternator repair in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on trailer axles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Car Alternator Repair

Example specification

ItemCar Alternator Repair
ApplicationTrailer Axles
VersionTwo-Piece Construction
Base materialABS Plastic
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpowder coated
MOQ3,000 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceRoHS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — ABS Plastic, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Car Alternator Repair example

Processes involved

  • gravity casting
  • die casting
  • shot blasting
  • CNC machining
  • cold forging
  • precision stamping

Where this example applies

Programmes that run two-piece construction most often specify this build for trailer axles. Related applications include export programmes, boat trailers, scooter fleets, assembly programmes, workshop replacements.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top