Welcome to Auto, Motorcycle Parts & Accessories official website!

Phase Change Cooling System Specification Example for Export Programmes: Vented Design

Source:Performance Engine Crank / Time:2026-09-18

Phase Change Cooling System Specification Example for Export Programmes: Vented Design

This is a worked specification for phase change cooling system in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The vented design version exists because the duty cycle on export programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Phase Change Cooling System

Example specification

ItemPhase Change Cooling System
ApplicationExport Programmes
VersionVented Design
Base materialAluminium Alloy
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceRoHS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Aluminium Alloy, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Phase Change Cooling System example

Processes involved

  • surface grinding
  • precision stamping
  • die casting
  • laser cutting
  • assembly line testing
  • rubber vulcanisation

Where this example applies

Programmes that run vented design most often specify this build for export programmes. Related applications include fleet maintenance, delivery vans, emergency vehicles, workshop replacements, camper conversions.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top