Welcome to Auto, Motorcycle Parts & Accessories official website!

Auto Oil Separator Specification Example for Camper Conversions: Sealed Unit

Source:Electric Car Motor / Time:2026-09-18

Auto Oil Separator Specification Example for Camper Conversions: Sealed Unit

This is a worked specification for auto oil separator in a sealed unit programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The sealed unit version exists because the duty cycle on camper conversions is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Auto Oil Separator

Example specification

ItemAuto Oil Separator
ApplicationCamper Conversions
VersionSealed Unit
Base materialPolypropylene
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishzinc plated
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Polypropylene, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Auto Oil Separator example

Processes involved

  • robot welding
  • rubber vulcanisation
  • heat treatment
  • powder coating
  • assembly line testing
  • CNC machining

Where this example applies

Programmes that run sealed unit most often specify this build for camper conversions. Related applications include off-road bikes, camper conversions, trailer axles, light trucks, workshop replacements.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top