Fuel Auto Filter Specification Example for City Buses: Touring Version
Fuel Auto Filter Specification Example for City Buses: Touring Version
This is a worked specification for fuel auto filter in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The touring version version exists because the duty cycle on city buses is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Example specification
| Item | Fuel Auto Filter |
|---|---|
| Application | City Buses |
| Version | Touring Version |
| Base material | EPDM Rubber |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | painted |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | ISO 9001 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — EPDM Rubber, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- cold forging
- laser cutting
- electroplating
- robot welding
- powder coating
- shot blasting
Where this example applies
Programmes that run touring version most often specify this build for city buses. Related applications include fleet maintenance, delivery vans, export programmes, scooter fleets, rental motorcycles.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



