Tire Balancing Machine Specification Example for Three-Wheelers: Heavy Duty

Source:Mixed Service Tire / Time:2026-09-18

Tire Balancing Machine Specification Example for Three-Wheelers: Heavy Duty

This is a worked specification for tire balancing machine in a heavy duty programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The heavy duty version exists because the duty cycle on three-wheelers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Tire Balancing Machine

Example specification

ItemTire Balancing Machine
ApplicationThree-Wheelers
VersionHeavy Duty
Base materialSintered Metal
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishanodised
MOQ1,000 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Sintered Metal, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Tire Balancing Machine example

Processes involved

  • ultrasonic cleaning
  • heat treatment
  • anodising
  • shot blasting
  • injection moulding
  • sintering

Where this example applies

Programmes that run heavy duty most often specify this build for three-wheelers. Related applications include racing teams, assembly programmes, emergency vehicles, delivery vans, three-wheelers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top