Fuel Cooling System Specification Example for Rental Motorcycles: Touring Version
Fuel Cooling System Specification Example for Rental Motorcycles: Touring Version
This is a worked specification for fuel cooling system in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The touring version version exists because the duty cycle on rental motorcycles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Example specification
| Item | Fuel Cooling System |
|---|---|
| Application | Rental Motorcycles |
| Version | Touring Version |
| Base material | Sintered Metal |
| Controlled dimensions | 5 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | anodised |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | RoHS |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Sintered Metal, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- robot welding
- shot blasting
- anodising
- die casting
- assembly line testing
- powder coating
Where this example applies
Programmes that run touring version most often specify this build for rental motorcycles. Related applications include trailer axles, boat trailers, aftermarket retail, construction equipment, agricultural trailers.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.



