Cornering Light Specification Example for Three-Wheelers: Folding Type
Cornering Light Specification Example for Three-Wheelers: Folding Type
This is a worked specification for cornering light in a folding type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The folding type version exists because the duty cycle on three-wheelers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Example specification
| Item | Cornering Light |
|---|---|
| Application | Three-Wheelers |
| Version | Folding Type |
| Base material | EPDM Rubber |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | painted |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | TUV |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — EPDM Rubber, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- CNC machining
- shot blasting
- cold forging
- precision stamping
- laser cutting
- injection moulding
Where this example applies
Programmes that run folding type most often specify this build for three-wheelers. Related applications include city buses, long-haul trucks, off-road bikes, racing teams, light trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Send the specification you are working to and we will confirm what we can match, what we would change and why.



