This is a worked specification for spare parts other motorcycle parts accessories in a sealed unit programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The sealed unit version exists because the duty cycle on three-wheelers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Example specification
| Item | Spare Parts Other Motorcycle Parts Accessories |
|---|---|
| Application | Three-Wheelers |
| Version | Sealed Unit |
| Base material | Titanium Alloy |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | powder coated |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Titanium Alloy, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- laser cutting
- CNC machining
- shot blasting
- die casting
- heat treatment
Where this example applies
Programmes that run sealed unit most often specify this build for three-wheelers. Related applications include camper conversions, light trucks, racing teams, assembly programmes, aftermarket retail.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.