Transmission Fluid Pan Specification Example for Fleet Maintenance: Load Rated Version
Transmission Fluid Pan Specification Example for Fleet Maintenance: Load Rated Version
This is a worked specification for transmission fluid pan in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The load rated version version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Example specification
| Item | Transmission Fluid Pan |
|---|---|
| Application | Fleet Maintenance |
| Version | Load Rated Version |
| Base material | Ceramic Composite |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | as machined |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | CCC |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Ceramic Composite, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.
![]()
Processes involved
- heat treatment
- injection moulding
- gravity casting
- rubber vulcanisation
- robot welding
- laser cutting
Where this example applies
Programmes that run load rated version most often specify this build for fleet maintenance. Related applications include trailer axles, export programmes, municipal fleets, camper conversions, scooter fleets.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.



