Air Shock Absorber Specification Example for Export Programmes: Low Maintenance Version
Air Shock Absorber Specification Example for Export Programmes: Low Maintenance Version
This is a worked specification for air shock absorber in a low maintenance version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The low maintenance version version exists because the duty cycle on export programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Example specification
| Item | Air Shock Absorber |
|---|---|
| Application | Export Programmes |
| Version | Low Maintenance Version |
| Base material | PVC Coated Fabric |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | as machined |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | TUV |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — PVC Coated Fabric, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- electroplating
- die casting
- heat treatment
- assembly line testing
- laser cutting
- injection moulding
Where this example applies
Programmes that run low maintenance version most often specify this build for export programmes. Related applications include fleet maintenance, assembly programmes, rental motorcycles, municipal fleets, light trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



