Welcome to Auto, Motorcycle Parts & Accessories official website!

Hydraulic Engine Mount Specification Example for Agricultural Trailers: Lightweight Version

Source:Auto Oil Separator / Time:2026-09-18

Hydraulic Engine Mount Specification Example for Agricultural Trailers: Lightweight Version

This is a worked specification for hydraulic engine mount in a lightweight version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The lightweight version version exists because the duty cycle on agricultural trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Hydraulic Engine Mount

Example specification

ItemHydraulic Engine Mount
ApplicationAgricultural Trailers
VersionLightweight Version
Base materialSintered Metal
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ500 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Sintered Metal, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Hydraulic Engine Mount example

Processes involved

  • precision stamping
  • die casting
  • gravity casting
  • surface grinding
  • cold forging
  • heat treatment

Where this example applies

Programmes that run lightweight version most often specify this build for agricultural trailers. Related applications include city buses, boat trailers, off-road bikes, racing teams, courier fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top