Otr Tire Truck Specification Example for Trailer Axles: Touring Version
Otr Tire Truck Specification Example for Trailer Axles: Touring Version
This is a worked specification for otr tire truck in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The touring version version exists because the duty cycle on trailer axles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Example specification
| Item | Otr Tire Truck |
|---|---|
| Application | Trailer Axles |
| Version | Touring Version |
| Base material | Brass |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | anodised |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | SGS |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Brass, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- assembly line testing
- laser cutting
- robot welding
- anodising
- shot blasting
Where this example applies
Programmes that run touring version most often specify this build for trailer axles. Related applications include utility trailers, aftermarket retail, trailer axles, fleet maintenance, construction equipment.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
Send the specification you are working to and we will confirm what we can match, what we would change and why.



