Welcome to Auto, Motorcycle Parts & Accessories official website!

AC Receiver Drier Specification Example for Trailer Axles: OEM Replacement

Source:Maintenance Free Car Battery / Time:2026-09-18

AC Receiver Drier Specification Example for Trailer Axles: OEM Replacement

This is a worked specification for ac receiver drier in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The oem replacement version exists because the duty cycle on trailer axles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

AC Receiver Drier

Example specification

ItemAC Receiver Drier
ApplicationTrailer Axles
VersionOEM Replacement
Base materialEPDM Rubber
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ3,000 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceSAE J431

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — EPDM Rubber, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

AC Receiver Drier example

Processes involved

  • sintering
  • cold forging
  • shot blasting
  • CNC machining
  • robot welding
  • powder coating

Where this example applies

Programmes that run oem replacement most often specify this build for trailer axles. Related applications include aftermarket retail, rental motorcycles, utility trailers, workshop replacements, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top