Welcome to Auto, Motorcycle Parts & Accessories official website!

Car AC Compressor Specification Example for Construction Equipment: Folding Type

Source:Adjustable Rear Suspension / Time:2026-09-18

Car AC Compressor Specification Example for Construction Equipment: Folding Type

This is a worked specification for car ac compressor in a folding type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The folding type version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Car AC Compressor

Example specification

ItemCar AC Compressor
ApplicationConstruction Equipment
VersionFolding Type
Base materialSemi-Metallic Compound
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpowder coated
MOQ1,000 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Semi-Metallic Compound, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Car AC Compressor example

Processes involved

  • sintering
  • gravity casting
  • rubber vulcanisation
  • die casting
  • surface grinding
  • shot blasting

Where this example applies

Programmes that run folding type most often specify this build for construction equipment. Related applications include assembly programmes, fleet maintenance, racing teams, workshop replacements, light trucks.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top