Auto Detailing Wax Specification Example for City Buses: Standard Replacement
Auto Detailing Wax Specification Example for City Buses: Standard Replacement
This is a worked specification for auto detailing wax in a standard replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The standard replacement version exists because the duty cycle on city buses is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Example specification
| Item | Auto Detailing Wax |
|---|---|
| Application | City Buses |
| Version | Standard Replacement |
| Base material | Natural Rubber |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | zinc plated |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | IATF 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Natural Rubber, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- powder coating
- laser cutting
- electroplating
- anodising
- surface grinding
- shot blasting
Where this example applies
Programmes that run standard replacement most often specify this build for city buses. Related applications include light trucks, scooter fleets, rental motorcycles, export programmes, city buses.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



