Snow Chains For Tires Specification Example for Assembly Programmes: Load Rated Version
Snow Chains For Tires Specification Example for Assembly Programmes: Load Rated Version
This is a worked specification for snow chains for tires in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The load rated version version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Example specification
| Item | Snow Chains For Tires |
|---|---|
| Application | Assembly Programmes |
| Version | Load Rated Version |
| Base material | Ceramic Composite |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | powder coated |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | SGS |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Ceramic Composite, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- surface grinding
- rubber vulcanisation
- gravity casting
- sintering
- anodising
- assembly line testing
Where this example applies
Programmes that run load rated version most often specify this build for assembly programmes. Related applications include camper conversions, racing teams, utility trailers, delivery vans, assembly programmes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.



