Integrated Rear Lights Specification Example for Boat Trailers: Racing Spec
Integrated Rear Lights Specification Example for Boat Trailers: Racing Spec
This is a worked specification for integrated rear lights in a racing spec programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The racing spec version exists because the duty cycle on boat trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Example specification
| Item | Integrated Rear Lights |
|---|---|
| Application | Boat Trailers |
| Version | Racing Spec |
| Base material | Sintered Metal |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | painted |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | REACH |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Sintered Metal, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- sintering
- gravity casting
- die casting
- laser cutting
- cold forging
- CNC machining
Where this example applies
Programmes that run racing spec most often specify this build for boat trailers. Related applications include dealership service, courier fleets, aftermarket retail, racing teams, three-wheelers.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



