12V Electric Car Fridge Specification Example for Off-Road Bikes: High Performance
12V Electric Car Fridge Specification Example for Off-Road Bikes: High Performance
This is a worked specification for 12v electric car fridge in a high performance programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The high performance version exists because the duty cycle on off-road bikes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Example specification
| Item | 12V Electric Car Fridge |
|---|---|
| Application | Off-Road Bikes |
| Version | High Performance |
| Base material | Kevlar Composite |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | zinc plated |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | ISO/TS 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Kevlar Composite, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- robot welding
- ultrasonic cleaning
- injection moulding
- surface grinding
- assembly line testing
- precision stamping
Where this example applies
Programmes that run high performance most often specify this build for off-road bikes. Related applications include light trucks, camper conversions, three-wheelers, export programmes, construction equipment.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.



