Welcome to Auto, Motorcycle Parts & Accessories official website!

Air Conditioning Filter Drier Specification Example for Workshop Replacements: Two-Piece Construction

Source:Air Auto Filter / Time:2026-09-18

Air Conditioning Filter Drier Specification Example for Workshop Replacements: Two-Piece Construction

This is a worked specification for air conditioning filter drier in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Air Conditioning Filter Drier

Example specification

ItemAir Conditioning Filter Drier
ApplicationWorkshop Replacements
VersionTwo-Piece Construction
Base materialTempered Glass
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishanodised
MOQ500 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceTUV

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Tempered Glass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Air Conditioning Filter Drier example

Processes involved

  • assembly line testing
  • rubber vulcanisation
  • gravity casting
  • shot blasting
  • laser cutting
  • CNC machining

Where this example applies

Programmes that run two-piece construction most often specify this build for workshop replacements. Related applications include trailer axles, export programmes, municipal fleets, camper conversions, fleet maintenance.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top