Welcome to Auto, Motorcycle Parts & Accessories official website!

Rearview Mirror Camera Specification Example for Three-Wheelers: Heavy Duty

Source:Onboard Diagnostic Tools / Time:2026-09-18

Rearview Mirror Camera Specification Example for Three-Wheelers: Heavy Duty

This is a worked specification for rearview mirror camera in a heavy duty programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The heavy duty version exists because the duty cycle on three-wheelers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Rearview Mirror Camera

Example specification

ItemRearview Mirror Camera
ApplicationThree-Wheelers
VersionHeavy Duty
Base materialHigh Density Foam
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishanodised
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — High Density Foam, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Rearview Mirror Camera example

Processes involved

  • electroplating
  • CNC machining
  • robot welding
  • die casting
  • injection moulding
  • gravity casting

Where this example applies

Programmes that run heavy duty most often specify this build for three-wheelers. Related applications include aftermarket retail, utility trailers, delivery vans, fleet maintenance, racing teams.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top