Welcome to Auto, Motorcycle Parts & Accessories official website!

Off-Road LED Bar Specification Example for Three-Wheelers: Long Life Version

Source:Durable Electric Bicycle Tire / Time:2026-09-18

Off-Road LED Bar Specification Example for Three-Wheelers: Long Life Version

This is a worked specification for off-road led bar in a long life version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The long life version version exists because the duty cycle on three-wheelers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Off-Road LED Bar

Example specification

ItemOff-Road LED Bar
ApplicationThree-Wheelers
VersionLong Life Version
Base materialAluminium Alloy
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishas machined
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Aluminium Alloy, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Off-Road LED Bar example

Processes involved

  • die casting
  • precision stamping
  • surface grinding
  • shot blasting
  • powder coating
  • anodising

Where this example applies

Programmes that run long life version most often specify this build for three-wheelers. Related applications include construction equipment, agricultural trailers, delivery vans, three-wheelers, utility trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top