Air Conditioning Filter Drier Specification Example for Fleet Maintenance: Two-Piece Construction
Air Conditioning Filter Drier Specification Example for Fleet Maintenance: Two-Piece Construction
This is a worked specification for air conditioning filter drier in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The two-piece construction version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Example specification
| Item | Air Conditioning Filter Drier |
|---|---|
| Application | Fleet Maintenance |
| Version | Two-Piece Construction |
| Base material | Brass |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | anodised |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | TUV |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Brass, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- ultrasonic cleaning
- surface grinding
- robot welding
- cold forging
- sintering
- CNC machining
Where this example applies
Programmes that run two-piece construction most often specify this build for fleet maintenance. Related applications include assembly programmes, export programmes, city buses, municipal fleets, light trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.



