Diesel Engine Fuel System Specification Example for Municipal Fleets: Long Life Version
Diesel Engine Fuel System Specification Example for Municipal Fleets: Long Life Version
This is a worked specification for diesel engine fuel system in a long life version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The long life version version exists because the duty cycle on municipal fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Example specification
| Item | Diesel Engine Fuel System |
|---|---|
| Application | Municipal Fleets |
| Version | Long Life Version |
| Base material | ABS Plastic |
| Controlled dimensions | 5 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | painted |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | IATF 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — ABS Plastic, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- sintering
- heat treatment
- surface grinding
- shot blasting
- injection moulding
- robot welding
Where this example applies
Programmes that run long life version most often specify this build for municipal fleets. Related applications include courier fleets, light trucks, long-haul trucks, off-road bikes, city buses.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



