63 Inch Titan Tire Specification Example for Racing Teams: Budget Line
63 Inch Titan Tire Specification Example for Racing Teams: Budget Line
This is a worked specification for 63 inch titan tire in a budget line programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The budget line version exists because the duty cycle on racing teams is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Example specification
| Item | 63 Inch Titan Tire |
|---|---|
| Application | Racing Teams |
| Version | Budget Line |
| Base material | EPDM Rubber |
| Controlled dimensions | 5 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | as machined |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | CCC |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — EPDM Rubber, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- die casting
- assembly line testing
- cold forging
- electroplating
- ultrasonic cleaning
- robot welding
Where this example applies
Programmes that run budget line most often specify this build for racing teams. Related applications include emergency vehicles, courier fleets, trailer axles, aftermarket retail, assembly programmes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.



