Welcome to Auto, Motorcycle Parts & Accessories official website!

Car Audio System Specification Example for Construction Equipment: Touring Version

Source:Car Bearing / Time:2026-09-18

Car Audio System Specification Example for Construction Equipment: Touring Version

This is a worked specification for car audio system in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The touring version version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Car Audio System

Example specification

ItemCar Audio System
ApplicationConstruction Equipment
VersionTouring Version
Base materialTempered Glass
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpowder coated
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceE-mark

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Tempered Glass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Car Audio System example

Processes involved

  • gravity casting
  • rubber vulcanisation
  • surface grinding
  • assembly line testing
  • CNC machining
  • die casting

Where this example applies

Programmes that run touring version most often specify this build for construction equipment. Related applications include construction equipment, dealership service, assembly programmes, boat trailers, municipal fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top