Car AC Compressor Specification Example for Camper Conversions: OEM Replacement
Car AC Compressor Specification Example for Camper Conversions: OEM Replacement
This is a worked specification for car ac compressor in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The oem replacement version exists because the duty cycle on camper conversions is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Example specification
| Item | Car AC Compressor |
|---|---|
| Application | Camper Conversions |
| Version | OEM Replacement |
| Base material | PVC Coated Fabric |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | zinc plated |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — PVC Coated Fabric, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- shot blasting
- powder coating
- heat treatment
- die casting
- precision stamping
- cold forging
Where this example applies
Programmes that run oem replacement most often specify this build for camper conversions. Related applications include off-road bikes, delivery vans, city buses, rental motorcycles, racing teams.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



