Welcome to Auto, Motorcycle Parts & Accessories official website!

Electric Power Steering System Specification Example for Fleet Maintenance: Vented Design

Source:Air Conditioning Filter Drier / Time:2026-09-18

Electric Power Steering System Specification Example for Fleet Maintenance: Vented Design

This is a worked specification for electric power steering system in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The vented design version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Electric Power Steering System

Example specification

ItemElectric Power Steering System
ApplicationFleet Maintenance
VersionVented Design
Base materialZinc Plated Steel
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpainted
MOQ200 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Zinc Plated Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Electric Power Steering System example

Processes involved

  • assembly line testing
  • powder coating
  • surface grinding
  • injection moulding
  • shot blasting
  • die casting

Where this example applies

Programmes that run vented design most often specify this build for fleet maintenance. Related applications include city buses, fleet maintenance, rental motorcycles, emergency vehicles, long-haul trucks.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top