Heavy Duty Farm Tires Specification Example for Light Trucks: Off-Road Version
Heavy Duty Farm Tires Specification Example for Light Trucks: Off-Road Version
This is a worked specification for heavy duty farm tires in a off-road version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The off-road version version exists because the duty cycle on light trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Example specification
| Item | Heavy Duty Farm Tires |
|---|---|
| Application | Light Trucks |
| Version | Off-Road Version |
| Base material | Cast Iron |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | powder coated |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | RoHS |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Cast Iron, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- assembly line testing
- rubber vulcanisation
- ultrasonic cleaning
- shot blasting
- robot welding
Where this example applies
Programmes that run off-road version most often specify this build for light trucks. Related applications include trailer axles, scooter fleets, rental motorcycles, utility trailers, camper conversions.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.