Welcome to Auto, Motorcycle Parts & Accessories official website!

Car Sun Rain Guard Specification Example for Municipal Fleets: Two-Piece Construction

Source:Diesel Fuel Enhancer / Time:2026-09-18

Car Sun Rain Guard Specification Example for Municipal Fleets: Two-Piece Construction

This is a worked specification for car sun rain guard in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on municipal fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Car Sun Rain Guard

Example specification

ItemCar Sun Rain Guard
ApplicationMunicipal Fleets
VersionTwo-Piece Construction
Base materialKevlar Composite
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishanodised
MOQ500 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceISO/TS 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Kevlar Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Car Sun Rain Guard example

Processes involved

  • CNC machining
  • shot blasting
  • gravity casting
  • assembly line testing
  • powder coating
  • surface grinding

Where this example applies

Programmes that run two-piece construction most often specify this build for municipal fleets. Related applications include rental motorcycles, delivery vans, city buses, scooter fleets, emergency vehicles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top