Welcome to Auto, Motorcycle Parts & Accessories official website!

Universal Roof Rack Specification Example for Long-Haul Trucks: Drilled and Slotted

Source:Asymmetric Tread Pattern Tire / Time:2026-09-18

Universal Roof Rack Specification Example for Long-Haul Trucks: Drilled and Slotted

This is a worked specification for universal roof rack in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The drilled and slotted version exists because the duty cycle on long-haul trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Universal Roof Rack

Example specification

ItemUniversal Roof Rack
ApplicationLong-Haul Trucks
VersionDrilled and Slotted
Base materialCarbon Fibre Composite
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishzinc plated
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceRoHS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Carbon Fibre Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Universal Roof Rack example

Processes involved

  • assembly line testing
  • heat treatment
  • precision stamping
  • CNC machining
  • surface grinding
  • ultrasonic cleaning

Where this example applies

Programmes that run drilled and slotted most often specify this build for long-haul trucks. Related applications include city buses, racing teams, boat trailers, workshop replacements, agricultural trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top