Welcome to Auto, Motorcycle Parts & Accessories official website!

Fuel Cooling System Specification Example for Aftermarket Retail: Folding Type

Source:Commercial AC Charging Station / Time:2026-09-18

Fuel Cooling System Specification Example for Aftermarket Retail: Folding Type

This is a worked specification for fuel cooling system in a folding type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The folding type version exists because the duty cycle on aftermarket retail is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Fuel Cooling System

Example specification

ItemFuel Cooling System
ApplicationAftermarket Retail
VersionFolding Type
Base materialPVC Coated Fabric
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpainted
MOQ2,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — PVC Coated Fabric, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Fuel Cooling System example

Processes involved

  • CNC machining
  • electroplating
  • anodising
  • powder coating
  • precision stamping
  • surface grinding

Where this example applies

Programmes that run folding type most often specify this build for aftermarket retail. Related applications include trailer axles, scooter fleets, delivery vans, fleet maintenance, workshop replacements.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top