Welcome to Auto, Motorcycle Parts & Accessories official website!

AC Receiver Drier Specification Example for Export Programmes: OEM Replacement

Source:LED Headlight / Time:2026-09-18

AC Receiver Drier Specification Example for Export Programmes: OEM Replacement

This is a worked specification for ac receiver drier in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The oem replacement version exists because the duty cycle on export programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

AC Receiver Drier

Example specification

ItemAC Receiver Drier
ApplicationExport Programmes
VersionOEM Replacement
Base materialChromed Steel
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ2,000 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Chromed Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

AC Receiver Drier example

Processes involved

  • sintering
  • cold forging
  • powder coating
  • ultrasonic cleaning
  • heat treatment
  • robot welding

Where this example applies

Programmes that run oem replacement most often specify this build for export programmes. Related applications include city buses, boat trailers, municipal fleets, passenger cars, camper conversions.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top