Wireless Backup Camera Specification Example for City Buses: Heavy Duty
Wireless Backup Camera Specification Example for City Buses: Heavy Duty
This is a worked specification for wireless backup camera in a heavy duty programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The heavy duty version exists because the duty cycle on city buses is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Example specification
| Item | Wireless Backup Camera |
|---|---|
| Application | City Buses |
| Version | Heavy Duty |
| Base material | Magnesium Alloy |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | painted |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ISO 9001 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Magnesium Alloy, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- injection moulding
- CNC machining
- rubber vulcanisation
- sintering
- shot blasting
- heat treatment
Where this example applies
Programmes that run heavy duty most often specify this build for city buses. Related applications include delivery vans, passenger cars, export programmes, camper conversions, assembly programmes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.



