Welcome to Auto, Motorcycle Parts & Accessories official website!

Steel Spoke Specification Example for Fleet Maintenance: Vented Design

Source:Engine Piston Ring Set / Time:2026-09-18

Steel Spoke Specification Example for Fleet Maintenance: Vented Design

This is a worked specification for steel spoke in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The vented design version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Steel Spoke

Example specification

ItemSteel Spoke
ApplicationFleet Maintenance
VersionVented Design
Base materialMagnesium Alloy
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpowder coated
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceSAE J431

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Magnesium Alloy, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Steel Spoke example

Processes involved

  • sintering
  • shot blasting
  • electroplating
  • die casting
  • heat treatment
  • precision stamping

Where this example applies

Programmes that run vented design most often specify this build for fleet maintenance. Related applications include long-haul trucks, workshop replacements, light trucks, racing teams, rental motorcycles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top