Welcome to Auto, Motorcycle Parts & Accessories official website!

Car Cooling System Specification Example for Rental Motorcycles: Drilled and Slotted

Source:Car Battery Booster Cable / Time:2026-09-18

Car Cooling System Specification Example for Rental Motorcycles: Drilled and Slotted

This is a worked specification for car cooling system in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The drilled and slotted version exists because the duty cycle on rental motorcycles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Car Cooling System

Example specification

ItemCar Cooling System
ApplicationRental Motorcycles
VersionDrilled and Slotted
Base materialForged Aluminium
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpowder coated
MOQ500 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Forged Aluminium, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Car Cooling System example

Processes involved

  • precision stamping
  • surface grinding
  • powder coating
  • cold forging
  • ultrasonic cleaning
  • laser cutting

Where this example applies

Programmes that run drilled and slotted most often specify this build for rental motorcycles. Related applications include passenger cars, workshop replacements, three-wheelers, delivery vans, municipal fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top