Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Oil Sump Specification Example for Workshop Replacements: Waterproof Version

Source:Portable Car Lift / Time:2026-09-18

Engine Oil Sump Specification Example for Workshop Replacements: Waterproof Version

This is a worked specification for engine oil sump in a waterproof version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The waterproof version version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Engine Oil Sump

Example specification

ItemEngine Oil Sump
ApplicationWorkshop Replacements
VersionWaterproof Version
Base materialForged Aluminium
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishanodised
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Forged Aluminium, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Oil Sump example

Processes involved

  • heat treatment
  • robot welding
  • gravity casting
  • surface grinding
  • sintering
  • die casting

Where this example applies

Programmes that run waterproof version most often specify this build for workshop replacements. Related applications include utility trailers, fleet maintenance, passenger cars, delivery vans, trailer axles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top