Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Oil Sump Specification Example for Courier Fleets: Off-Road Version

Source:Engine Oil Sump / Time:2026-09-18

Engine Oil Sump Specification Example for Courier Fleets: Off-Road Version

This is a worked specification for engine oil sump in a off-road version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The off-road version version exists because the duty cycle on courier fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Engine Oil Sump

Example specification

ItemEngine Oil Sump
ApplicationCourier Fleets
VersionOff-Road Version
Base materialTitanium Alloy
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishanodised
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Titanium Alloy, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Oil Sump example

Processes involved

  • die casting
  • shot blasting
  • sintering
  • rubber vulcanisation
  • ultrasonic cleaning
  • surface grinding

Where this example applies

Programmes that run off-road version most often specify this build for courier fleets. Related applications include aftermarket retail, assembly programmes, camper conversions, light trucks, passenger cars.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top