Welcome to Auto, Motorcycle Parts & Accessories official website!

Pneumatic Brake Specification Example for Light Trucks: Two-Piece Construction

Source:Electric Vehicle Inverter / Time:2026-09-18

Pneumatic Brake Specification Example for Light Trucks: Two-Piece Construction

This is a worked specification for pneumatic brake in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on light trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Pneumatic Brake

Example specification

ItemPneumatic Brake
ApplicationLight Trucks
VersionTwo-Piece Construction
Base materialNylon 66
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishanodised
MOQ500 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Nylon 66, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Pneumatic Brake example

Processes involved

  • powder coating
  • laser cutting
  • electroplating
  • shot blasting
  • cold forging
  • gravity casting

Where this example applies

Programmes that run two-piece construction most often specify this build for light trucks. Related applications include off-road bikes, fleet maintenance, dealership service, three-wheelers, passenger cars.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top