Welcome to Auto, Motorcycle Parts & Accessories official website!

Air Shock Absorber Specification Example for Construction Equipment: Drilled and Slotted

Source:Car Paint Protection Film / Time:2026-09-18

Air Shock Absorber Specification Example for Construction Equipment: Drilled and Slotted

This is a worked specification for air shock absorber in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The drilled and slotted version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Air Shock Absorber

Example specification

ItemAir Shock Absorber
ApplicationConstruction Equipment
VersionDrilled and Slotted
Base materialCast Iron
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishzinc plated
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceE-mark

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Cast Iron, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Air Shock Absorber example

Processes involved

  • rubber vulcanisation
  • die casting
  • laser cutting
  • powder coating
  • anodising
  • assembly line testing

Where this example applies

Programmes that run drilled and slotted most often specify this build for construction equipment. Related applications include assembly programmes, boat trailers, off-road bikes, passenger cars, scooter fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

What testing is included?

Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top