Welcome to Auto, Motorcycle Parts & Accessories official website!

Hydraulic Piston Specification Example for Workshop Replacements: Off-Road Version

Source:Stainless Steel Muffler / Time:2026-09-18

Hydraulic Piston Specification Example for Workshop Replacements: Off-Road Version

This is a worked specification for hydraulic piston in a off-road version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The off-road version version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Hydraulic Piston

Example specification

ItemHydraulic Piston
ApplicationWorkshop Replacements
VersionOff-Road Version
Base materialBronze
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpainted
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Bronze, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Hydraulic Piston example

Processes involved

  • surface grinding
  • anodising
  • injection moulding
  • cold forging
  • sintering
  • powder coating

Where this example applies

Programmes that run off-road version most often specify this build for workshop replacements. Related applications include camper conversions, trailer axles, three-wheelers, workshop replacements, city buses.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top