This is a worked specification for industrial timing pulley in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The touring version version exists because the duty cycle on long-haul trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Example specification
| Item | Industrial Timing Pulley |
|---|---|
| Application | Long-Haul Trucks |
| Version | Touring Version |
| Base material | Kevlar Composite |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | powder coated |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ISO 9001 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Kevlar Composite, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- CNC machining
- die casting
- ultrasonic cleaning
- surface grinding
- laser cutting
- powder coating
Where this example applies
Programmes that run touring version most often specify this build for long-haul trucks. Related applications include long-haul trucks, off-road bikes, scooter fleets, emergency vehicles, light trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.