Tire Balancing Machine Specification Example for Aftermarket Retail: Budget Line
Tire Balancing Machine Specification Example for Aftermarket Retail: Budget Line
This is a worked specification for tire balancing machine in a budget line programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The budget line version exists because the duty cycle on aftermarket retail is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Example specification
| Item | Tire Balancing Machine |
|---|---|
| Application | Aftermarket Retail |
| Version | Budget Line |
| Base material | Silicone |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | zinc plated |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Silicone, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- electroplating
- powder coating
- injection moulding
- rubber vulcanisation
- assembly line testing
- die casting
Where this example applies
Programmes that run budget line most often specify this build for aftermarket retail. Related applications include scooter fleets, delivery vans, three-wheelers, aftermarket retail, passenger cars.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Send the specification you are working to and we will confirm what we can match, what we would change and why.