Leather Steering Wheel Grip Specification Example for Agricultural Trailers: Racing Spec
Leather Steering Wheel Grip Specification Example for Agricultural Trailers: Racing Spec
This is a worked specification for leather steering wheel grip in a racing spec programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The racing spec version exists because the duty cycle on agricultural trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Example specification
| Item | Leather Steering Wheel Grip |
|---|---|
| Application | Agricultural Trailers |
| Version | Racing Spec |
| Base material | Magnesium Alloy |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | powder coated |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | E-mark |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Magnesium Alloy, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- injection moulding
- CNC machining
- electroplating
- die casting
- surface grinding
- heat treatment
Where this example applies
Programmes that run racing spec most often specify this build for agricultural trailers. Related applications include courier fleets, camper conversions, aftermarket retail, passenger cars, emergency vehicles.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.