Welcome to Auto, Motorcycle Parts & Accessories official website!

Transmission Fluid Pan Specification Example for Long-Haul Trucks: Two-Piece Construction

Source:Pneumatic Brake / Time:2026-09-18

Transmission Fluid Pan Specification Example for Long-Haul Trucks: Two-Piece Construction

This is a worked specification for transmission fluid pan in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on long-haul trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Transmission Fluid Pan

Example specification

ItemTransmission Fluid Pan
ApplicationLong-Haul Trucks
VersionTwo-Piece Construction
Base materialReinforced Nylon
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishanodised
MOQ1,000 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Reinforced Nylon, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Transmission Fluid Pan example

Processes involved

  • cold forging
  • sintering
  • anodising
  • shot blasting
  • robot welding
  • ultrasonic cleaning

Where this example applies

Programmes that run two-piece construction most often specify this build for long-haul trucks. Related applications include trailer axles, assembly programmes, agricultural trailers, emergency vehicles, workshop replacements.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top