Welcome to Auto, Motorcycle Parts & Accessories official website!

Electric Motor Speed Controller Specification Example for Long-Haul Trucks: Two-Piece Construction

Source:Car Audio System / Time:2026-09-18

Electric Motor Speed Controller Specification Example for Long-Haul Trucks: Two-Piece Construction

This is a worked specification for electric motor speed controller in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on long-haul trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Electric Motor Speed Controller

Example specification

ItemElectric Motor Speed Controller
ApplicationLong-Haul Trucks
VersionTwo-Piece Construction
Base materialCeramic Composite
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishzinc plated
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceTUV

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Ceramic Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Electric Motor Speed Controller example

Processes involved

  • anodising
  • surface grinding
  • die casting
  • ultrasonic cleaning
  • shot blasting
  • laser cutting

Where this example applies

Programmes that run two-piece construction most often specify this build for long-haul trucks. Related applications include utility trailers, assembly programmes, workshop replacements, delivery vans, light trucks.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top