Engine Starter System Specification Example for Fleet Maintenance: Low Maintenance Version
Engine Starter System Specification Example for Fleet Maintenance: Low Maintenance Version
This is a worked specification for engine starter system in a low maintenance version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The low maintenance version version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Example specification
| Item | Engine Starter System |
|---|---|
| Application | Fleet Maintenance |
| Version | Low Maintenance Version |
| Base material | Zinc Plated Steel |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | anodised |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Zinc Plated Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- die casting
- rubber vulcanisation
- sintering
- heat treatment
- assembly line testing
- surface grinding
Where this example applies
Programmes that run low maintenance version most often specify this build for fleet maintenance. Related applications include emergency vehicles, racing teams, passenger cars, assembly programmes, export programmes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



