Welcome to Auto, Motorcycle Parts & Accessories official website!

Brake System Sensor Specification Example for Utility Trailers: Waterproof Version

Source:Vehicle Interior LED / Time:2026-09-18

Brake System Sensor Specification Example for Utility Trailers: Waterproof Version

This is a worked specification for brake system sensor in a waterproof version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The waterproof version version exists because the duty cycle on utility trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Brake System Sensor

Example specification

ItemBrake System Sensor
ApplicationUtility Trailers
VersionWaterproof Version
Base materialCeramic Composite
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishpowder coated
MOQ1,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Ceramic Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Brake System Sensor example

Processes involved

  • sintering
  • shot blasting
  • powder coating
  • rubber vulcanisation
  • electroplating
  • assembly line testing

Where this example applies

Programmes that run waterproof version most often specify this build for utility trailers. Related applications include boat trailers, agricultural trailers, camper conversions, courier fleets, racing teams.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top