Brake System Sensor Specification Example for Utility Trailers: Waterproof Version
Brake System Sensor Specification Example for Utility Trailers: Waterproof Version
This is a worked specification for brake system sensor in a waterproof version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The waterproof version version exists because the duty cycle on utility trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Example specification
| Item | Brake System Sensor |
|---|---|
| Application | Utility Trailers |
| Version | Waterproof Version |
| Base material | Ceramic Composite |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | powder coated |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | REACH |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Ceramic Composite, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- sintering
- shot blasting
- powder coating
- rubber vulcanisation
- electroplating
- assembly line testing
Where this example applies
Programmes that run waterproof version most often specify this build for utility trailers. Related applications include boat trailers, agricultural trailers, camper conversions, courier fleets, racing teams.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



